Skip to content
Sunday, November 29, 2026Newsletter
Advertisement
Odoo ERP Solutions

Odoo Bill of Materials Setup for Small Manufacturers

Learn how to configure all three Odoo BoM types, build multi-level assemblies, link work centers, and track scrap inside manufacturing orders.

By

Founder

6 min read

ShareLinkedInXEmail
Junious Digital Labs Insights title card with the headline "Odoo Bill of Materials Setup for Small Manufacturers" and the Odoo ERP Solutions label

Small manufacturers setting up Odoo often hit the same wall: the system ships with three distinct bill of materials types. Picking the wrong one early means rebuilding your production workflow later. If you run a small shop and want to get the odoo bill of materials small manufacturer configuration right the first time, this walkthrough is for you.

By the end, you will know when to use each BoM type, how to route components through the right work centers, when phantom sub-assemblies save you steps, and how to track scrap without letting it quietly eat your margins.

Three Odoo BoM Types for Small Manufacturers

Odoo gives you three bill of materials types, and picking the wrong one creates extra work every time you run production.

Manufacture is the default. Use it when your shop physically builds something: raw materials go in, a finished product comes out, and you want a manufacturing order with work center steps. This is the right choice for most assembled goods.

Kit skips the production order entirely. When you sell a kit, Odoo explodes it into its components at the point of sale or delivery. No work center, no production step. Use it for products you box and ship without any assembly work, like a spare-parts bundle or a tool kit sold as a unit.

Subcontracting tells Odoo that an outside vendor does the build. You send components to them and receive a finished good back. Odoo tracks the components consumed at the subcontractor's location, so your inventory stays accurate.

Advertisement

A common mistake is using a kit BoM for something that actually needs a work center step, then wondering why no labor cost shows up on the job. Ask yourself one question before you configure each product: does anyone in your facility or at a vendor touch this before it ships? If yes, choose manufacture or subcontracting accordingly.

Building a Single-Level Odoo Bill of Materials

Once you have chosen the right BoM type, open the product form in Odoo and click the Bill of Materials smart button. Create a new BoM and confirm the product and quantity this BoM produces.

Advertisement

Then add your components one line at a time.

  • Search for each component by internal reference or name.
  • Enter the quantity needed to produce one finished unit.
  • Set the unit of measure on each line to match how you stock that item.

That last point catches people. If you stock steel rod by the foot but your BoM calls for inches, Odoo will convert automatically only if the two units share the same category. Set up your unit of measure categories before you build BoMs, not after.

Save the record and run a quick test by creating a draft manufacturing order. Confirm the component list matches your paper spec sheet before you approve production. Fix discrepancies now, not mid-run. A BoM that looks correct on paper but references the wrong component unit will silently over-consume stock from the first production run, so verify every line before you close the draft.

Multi-Level BoMs and Phantom Sub-Assemblies

When a finished product contains a sub-assembly you build repeatedly, nesting BoMs saves time. Odoo lets you mark that sub-assembly as a phantom component inside the parent BoM. A phantom does not generate its own manufacturing order. Instead, Odoo flattens its components directly into the parent order.

Advertisement

Use a phantom when the sub-assembly has no independent stock value and you never sell it separately. A wiring harness built into a control panel is a common example. If you do track it as a stocked item, use a normal BoM and let Odoo create a linked manufacturing order instead.

To set this up, add the sub-assembly product as a component in your parent BoM, then set the component type field on that BoM line to Phantom. You will find this field on the component line itself inside Manufacturing, then Bills of Materials. Test the nesting by opening a draft manufacturing order for the parent product.

Check that all phantom components appear in the flat component list. Missing lines usually mean the sub-assembly BoM is incomplete or the component type field was not saved correctly. Resolve that before releasing any production orders.

Advertisement

Linking a BoM to a Work Center

Once your BoM structure is correct, attach operations to it so Odoo can schedule and time production.

Open the BoM and click the Operations tab. Add a line for each step in your process, such as cutting, assembly, or packaging. Each line asks for a work center, which is the machine or station where that step happens. Set up your work centers in Manufacturing, then Configuration, before you do this.

On each operation line, enter the cycle time. This is how long one unit takes at that step. Odoo uses these times to calculate total production duration on manufacturing orders. Keep your cycle times realistic. Inflated numbers push out scheduled dates. Times that are too low create false confidence in your capacity.

Advertisement

If you run a single work area, one work center is fine. Add more only when different stations have different costs or constraints. Start simple and expand the setup as your process data improves.

After saving, open a test manufacturing order and check the work orders tab. Confirm each operation appears with the correct work center and duration before you use the schedule in production. A common mistake is building the schedule before testing even one real order through the system.

Tracking Scrap and Material Variance in Manufacturing Orders

When you confirm a manufacturing order in Odoo, the system expects you to consume exactly what the BoM specifies. Real production rarely works that way. A component breaks, a cut wastes material, or a batch runs short. Record those losses as scrap directly on the manufacturing order using the scrap button. Odoo decreases the component quantity in inventory immediately and logs the move.

Each scrap entry requires a scrap location. Use a dedicated scrap location rather than a catch-all bin so your inventory reports stay clean. After the order closes, compare the planned quantity against the actual consumed quantity. That difference is your material variance.

Variance matters beyond the shop floor. Under the Materials and Supplies section of IRS Publication 334, materials and supplies used in manufacturing goods are charged to cost of goods sold. Unrecorded scrap understates your true cost of goods sold and distorts gross profit.

Advertisement

Run the manufacturing variance report at the end of each week. Investigate any line where actual consumption exceeds planned by more than a small amount. Consistent overuse usually points to a BoM quantity that needs correcting, not a production problem.

Common BoM Mistakes That Break Inventory Valuation

A few configuration errors quietly corrupt stock valuation without throwing obvious errors. Catching them early saves painful reconciliation later.

Advertisement

The most common mistake is a mismatched unit of measure, meaning the unit on the component differs from the unit on the BoM line. Odoo will convert automatically, but only if both units belong to the same category. A component measured in grams under a BoM line measured in kilograms works fine. Mixing weight and volume does not. Check every component's unit of measure category before you save the BoM.

Missing components are the next trap. If a component gets added to production informally but never added to the BoM, Odoo never reserves stock for it. Your on-hand quantity drifts low without a clear reason.

Serial number tracking causes its own problem. If you track finished goods by serial number but the manufacturing operation type is not configured to create new serials, Odoo blocks order completion. To fix this, navigate to Inventory, then Configuration, then Operations Types (Odoo documentation). Select the manufacturing operation type and choose the Create New option in the Lots/Serial Numbers section (Odoo documentation).

When a valuation report stops making sense, start with those three configuration areas in order: unit of measure categories, missing components, and operation type lot settings. Fix the upstream setting first, then reconfirm the downstream behavior before closing the work order.

For a related guide, see Inventory Valuation FIFO Average Cost Odoo: How to Choose. If you want help with this work, see our Odoo ERP services and Odoo development and implementation pages.

If you want to talk through your specific setup before training your team, book a free 30-minute call with Joshua and get a straight answer on where to start.

Frequently asked questions

How do I know which bill of materials type to use for my product?
Ask yourself whether anyone in your facility or at a vendor touches the product before it ships. If yes, use the manufacture or subcontracting type. If you are simply boxing and shipping components without any assembly work, use a kit.
What happens if my component units of measure do not match the bill of materials line?
Odoo will convert automatically, but only if both units belong to the same category. If they belong to different categories, the conversion will not work, so you should check every component unit of measure category before saving the bill of materials.
Why is Odoo blocking me from completing a manufacturing order for a serialized finished good?
If you track finished goods by serial number but the manufacturing operation type is not set to create new serial numbers, Odoo will block order completion. Go into the manufacturing operation type settings and update the Lots/Serial Numbers field to Create New.
How often should I review material variance on manufacturing orders?
Run the manufacturing variance report at the end of each week. Consistent overuse of a component usually points to a bill of materials quantity that needs correcting rather than a production problem.

Sources

  1. Under the Materials and Supplies section of IRS Publication 334, materials and supplies used in manufacturing goods are charged to cost of goods sold. irs.gov (accessed 2026-11-29)
  2. To fix this, navigate to Inventory, then Configuration, then Operations Types (Odoo documentation). odoo.com (accessed 2026-11-29)
  3. Select the manufacturing operation type and choose the Create New option in the Lots/Serial Numbers section (Odoo documentation). odoo.com (accessed 2026-11-29)
Advertisement

Outgrowing spreadsheets and disconnected apps?

Book a free 30-minute call. We will map how your business runs today and whether one connected system makes sense for you.

Book a free Odoo call

Related service: Odoo ERP Solutions

Junious Digital Labs logo

Joshua Junious

Founder of Junious Digital Labs, a veteran-owned IT consultancy. Army National Guard veteran and former IT director. About Joshua

Reach readers across the Junious Media Network. Advertise with us →